Saving time with Screw Piles

The client was installing a dust extraction system, the cyclone for which was to be placed externally, in the loading dock area.

In order to avoid an expensive interruption to the business, it was imperative that the work be completed quickly. Using double helix transition piles, we were able to reduce the down-time very significantly, from several days to just a couple of hours. In addition, damage to the asphalt pad was minimal, eliminating the need for major remedial work after installation of the equipment.

  • Down-time minimized
  • Minimal damage to asphalt pad
  • Significant cost savings