Two-Tier Screw Pile Deck

The homeowner was installing a two-tier deck at the rear of his residence. This required a foundation engineered to carry the weight of the structure as well as a large party of visitors.

Since the lawn was well established, the client was anxious to avoid any disturbance of existing landscaping. Conventional solutions would have required excavation and back filling which not only would have taken several days’ work, but the lawn would have needed extensive repair.

We installed properly engineered helical piles in just 2 hours, including welding on pile caps ready to receive the structural members. Our equipment never touched the lawn!

  • Engineered for safety
  • No disturbance of existing landscaping
  • 2-hour turnaround time

Have a job you'd like to talk about with us?